QUICK ANSWER

What you should know

  • ACH is a room-airflow rate, not an ISO cleanliness classification.
  • Required airflow equals room volume multiplied by the selected air-change rate.
  • The design rate must respond to particle generation, recovery, heat, moisture, exhaust and pressure balance.
  • Supply location, return location and airflow path can matter as much as the ACH number.
01

What ACH measures

Air changes per hour describes how many room volumes of supply air are delivered in one hour. It is convenient for comparing ventilation intensity, but it does not show whether the air reaches the critical zone, short-circuits to a return or removes particles at the required rate.

Air-change rateACH = supply airflow (m³/h) ÷ room volume (m³)

Rearranged for design airflow: supply airflow (m³/h) = room volume (m³) × selected ACH.

02

ISO class does not prescribe a single ACH

ISO 14644-1 classifies air cleanliness by airborne particle concentration. It does not assign one mandatory ACH to each ISO class. Two rooms with the same class can need different airflow because their people, process, layout, release rate, recovery target and operating state are different.

Published rules of thumb can help with an early concept, but they are not proof of performance. The selected design must be tested in the stated condition and supported by a monitoring and control strategy appropriate to the process.

03

Worked airflow example

Consider a room 6 m long, 4 m wide and 3 m high. Its gross volume is 72 m³. If the design study selects 30 ACH, the gross supply airflow is 2,160 m³/h, approximately 1,271 CFM.

Example6 m × 4 m × 3 m × 30 ACH = 2,160 m³/h ≈ 1,271 CFM

Then check exhaust, transfer air, room leakage, pressure offset, equipment heat, moisture loads and diversity. The final supply may be governed by a larger requirement.

Illustrative effect of changing ACH for the same 72 m³ room
Selected ACHSupply airflowApproximate CFMOne theoretical air change
151,080 m³/h636 CFM4 minutes
302,160 m³/h1,271 CFM2 minutes
453,240 m³/h1,907 CFM1.33 minutes
04

What should determine the design air-change rate?

Factors to document before selecting airflow
Design factorEngineering questionPossible airflow impact
People and processHow many sources operate, where, and for how long?More or stronger sources may need higher removal capacity or better local control
Critical zoneWhere must clean air protect the product or operation?May favour directed or unidirectional flow rather than simply increasing room ACH
Recovery targetHow fast must the room recover after a defined disturbance?Faster verified recovery can require more effective clean-air delivery
Heat and moistureWhat sensible and latent loads must be removed?Thermal or moisture duty may govern supply quantity and condition
ExhaustHow much air is removed by process or safety exhaust?Supply and makeup air must maintain mass balance and pressure
Room geometryAre there obstructions, tall equipment or enclosed zones?Distribution and return placement may need adjustment
05

Supply and return layout makes ACH effective

  • Place supply air so clean air reaches the critical work zone before it reaches contamination sources where practical.
  • Use return or exhaust locations that pull contamination away without creating harmful crossflow.
  • Check high-level heat plumes, low-level particle sources, equipment wakes and obstructions.
  • Avoid direct short-circuit paths from a diffuser to a nearby return.
  • Review door operation, transfer openings and pressure-control airflow together with room recirculation.
  • Confirm performance with balancing, airflow visualization, particle testing and recovery testing where required.
06

A practical ACH design sequence

  1. Define the controlled state

    State the required cleanliness class, occupancy and process condition.

  2. List contamination sources

    Map people, process, materials, equipment and adjacent-space risks.

  3. Calculate competing airflow duties

    Compare contamination control, heat, humidity, exhaust replacement and pressure balance.

  4. Lay out supply and returns

    Develop an airflow path that protects critical zones and avoids dead areas.

  5. Model or prototype when risk warrants

    Use airflow visualization, computational study or mock-up evidence appropriate to the consequence of failure.

  6. Balance, test and trend

    Verify actual airflow and performance, then adjust setpoints from evidence rather than rule of thumb alone.

Frequently asked questions

What ACH is required for an ISO 7 cleanroom?

ISO 14644-1 does not prescribe one ACH for ISO 7. The project must select and verify airflow based on contamination sources, operating state, recovery, heat and moisture loads, exhaust, pressure control and the applicable industry requirements.

Should return air be included in ACH?

ACH is commonly based on total supply airflow delivered to the room. The return, exhaust and leakage paths are then checked through a separate mass balance so the intended pressure and flow direction are maintained.

Does doubling ACH halve particle concentration?

Not automatically. The result depends on source strength, filtration, mixing, airflow path, leakage and ongoing activity. Testing or a validated model is needed for the actual room response.

Technical sources

Confirm the current controlled edition of every standard and the requirements that apply to your facility.

Prepared by 360S Projects as a practical learning reference. Final design, validation and compliance decisions should be made by competent professionals using current project requirements, standards and manufacturer data.

Related cleanroom guides