Skip to review starters
360SPROJECTSKnowledge for the work ahead

PREPARE THE NEXT PROJECT DISCUSSION

Coordinate the details.
Keep the questions.

Compare supplier information, coordinate wall and ceiling interfaces, and review raised-floor planning. Carry the open questions into your next discussion.

Choose a review starter ↓

These are prompts for reviewing information with your responsible team. Use current supplier documents and approved project drawings. The questions do not define design limits, installation methods or certification.

Blank review checklist. Record findings in your site records or create a project board.

01 / COMPARE THE EVIDENCE

Supplier technical review

Keep the same questions beside each manufacturer's published information before discussing suitability with your project team.

A public profile is a starting point for discussion. Record evidence and unresolved differences with the responsible team; this board does not rank suppliers or approve a product.

Project / area: ____________________ Review date: ____________
Prepared by: ________________________ Drawing / revision: ______________
  1. Which project requirement, proposed product model and current document revision are we comparing for each supplier?
  2. Which performance claims have supporting documents for the exact proposed configuration, and what remains unverified?
  3. Which dimensions, materials, interfaces and support arrangements need clarification against the coordinated drawings?
  4. What is included or excluded from each proposal, and which responsibilities need written confirmation?
  5. What installation, access and maintenance information is available for the proposed system?
  6. What delivery, local support and replacement-part arrangements still need confirmation directly with each supplier?
  7. Who will resolve each open question, what evidence is needed and when will the team review it again?

Observations, record references and actions

Action owner: _____________________ Next review: _____________________

360S review prompts · Reviewed 5 October 2026 · Discussion record, not a design approval or installation instruction.

02 / CHECK THE INTERFACES

Wall and ceiling coordination

Prepare one discussion covering partitions, ceiling modules, services and the access the team will need later.

Use the selected wall and ceiling system's current details and the approved project drawings. Support capacity, access permission and acceptance criteria require confirmation for that specific system.

Project / area: ____________________ Review date: ____________
Prepared by: ________________________ Drawing / revision: ______________
  1. Which coordinated drawing revision defines the room boundaries, wall junctions, ceiling modules and service locations?
  2. Where do doors, glazing, filters, lights and other openings need a coordinated interface detail?
  3. Who has confirmed how ceiling components and other loads are supported for the proposed configuration?
  4. Which wall-to-floor, wall-to-ceiling and service-penetration details still need agreement?
  5. What access is required for future service or replacement, and has the system supplier confirmed the permitted access method?
  6. Which installation sequence and interface checks must be agreed before closing concealed areas?
  7. Which unresolved drawing changes need an owner, a written response and a next review date?

Observations, record references and actions

Action owner: _____________________ Next review: _____________________

360S review prompts · Reviewed 5 October 2026 · Discussion record, not a design approval or installation instruction.

03 / PLAN BELOW THE SURFACE

Raised-floor coordination

Bring panel layout, underfloor services, equipment interfaces and future access into the same planning conversation.

Review the selected access-floor system with its supplier and responsible designer. These prompts do not specify structural loads, pedestal spacing, cutting methods or permission to remove panels.

Project / area: ____________________ Review date: ____________
Prepared by: ________________________ Drawing / revision: ______________
  1. Which floor-system specification, finished level and coordinated layout revision apply to this area?
  2. Where do columns, perimeter cuts, thresholds and equipment positions need a supplier-approved detail?
  3. Which equipment and movement-route loads need confirmation against the proposed floor system?
  4. Where do underfloor services or openings conflict with the proposed supports and access locations?
  5. If the void serves an airflow function, which opening locations and service obstructions need review with the HVAC designer?
  6. What panel access and floor-protection arrangements are required during installation and future maintenance?
  7. Who will close each unresolved interface, record the accepted detail and set the next review date?

Observations, record references and actions

Action owner: _____________________ Next review: _____________________

360S review prompts · Reviewed 5 October 2026 · Discussion record, not a design approval or installation instruction.

READ THE SOURCE IN ITS OWN CONTEXT

Source notes and scope.

The questions were written for 360S as preparation prompts. The references below inform the topics; they are not endorsements of this checklist or substitutes for the approved documentation for your project.

Public source notes checked 5 October 2026. Confirm current document revisions for the proposed system and application.